Comprising retail, office, apartment and hotel components, Hangzhou West HSR Integrated Development is located in the Yuhang District of Hangzhou, the capital as well as the economic, cultural, science and educational centre of Zhejiang Province, within the Yangtze River Delta Region. Science and technology firms are expected to set up their offices within the Hangzhou West Science and Technology Corridor. The new government-designated TOD District covers approximately 13 square kilometres and is envisaged to encompass cultural, ecological, commercial and residential zones. With plans to construct multiple super high-rise buildings in the TOD District, the entire surrounding precinct is set to be transformed into the Silicon Valley-equivalent of Hangzhou.
Slated for completion ahead of the Hangzhou Asian Games, Hangzhou West HSR Station is expected to house 11 platforms and 20 railway lines seamlessly connecting the regional intercity railway network via the Shanghai-Zhahang, Hangzhou-Linji, Huhang and Hangzhou- Wenzhou railways. It will also be served by Metro Line 3 and Airport Express Line, which are expected to commence operation by October 2022, and the future Metro Line 12 and City Express Line.
Cloud Gate, a distinct architectural feature of the project and an integral part of the HSR station, will comprise retail offerings, offices and a convention centre. The landmark project will create distinct character and build an esteemed image for the city.
Location | Unit YH-18 (High-speed Railway Hub Center), Yuhang District, Hangzhou |
Description2 | Retail Podium: 4 above ground and 1 basement level Office: 3 towers Cloud Gate: 4-11 levels tower Tower A: 5-43 levels Tower B: 5-34 levels Apartment: 2 48-storey towers 1 29-storey tower Hotel: in Tower A 45-59 levels, and in Tower B 35-47 levels Carpark: 4 basement levels |
Tenure | 40 years 23 November 2052 |
Effective Interest (%) |
11.1 |
Land Area (sq ft) |
1,066,101 |
Gross Floor Area (sq ft) |
10,710,709 |
Net Lettable Area (sq ft) |
- |
Status | Progressively complete from 2026 to 2028 |